Jawaban
Tugas 1 EKMA4315.01 |
|
|
|
|
|
|
|
|
|
|
Soal 1 |
|
|
|
|
|
|
|
|
|
Bahan
Baku digunakan |
250000 |
Bahan Penolong
digunakan |
Rp.
62.000 |
|
Tenaga Kerja Langsung ( TKL) |
287000 |
Perawatan
dan pemeliharaan gedung pabrik |
27000 |
|
Tenaga Kerja Tak Langsung (TKTL) |
55000 |
Depresiasi
gedung pabrik |
11000 |
|
Biaya pemasaran |
115000 |
Depresiasi
Gedung Kantor |
18000 |
|
Biaya administrasi |
89000 |
Listrik
Pabrik |
4000 |
|
|
|
|
|
|
a.
Prime Cost = Direct Material +
Direct Labor |
|
|
= |
250000 + |
287000
= |
537000 |
|
b.
Convertion Cost = Direct Labor Cost + Factory Overhead |
|
|
= |
287000 + |
177000
= |
464000 |
|
c.
Production Cost = Direct Material + Direct Labor + Utility + Depretiation +
Consumable Cost |
= |
250000 + 287000
4000 + 29000 = |
570000 |
|
|
|
|
|
|
|
|
|
|
|
Soal 2 |
|
|
|
|
|
|
|
|
|
Sediaan
Bahan Baku, 1 Januari 2013 |
68000 |
Sediaan Bahan
baku, 31 Desember 2013 |
18000 |
|
Pembelian Bahan Baku |
200000 |
Produk
dalam proses, 1 Januari 2013 |
105000 |
|
Tenaga Kerja Langsung ( TKL) |
287000 |
Produk
dalam proses, 31 Desember 2013 |
65000 |
|
Overhead pabrik |
159000 |
Produk
Jadi, 1 Januari 2013 |
44000 |
|
Biaya pemasaran |
115000 |
Produk
Jadi, 31 Desember 2013 |
27000 |
|
Biaya administrasi |
89000 |
Penjualan |
1000000 |
|
|
|
|
|
|
Diminta : |
|
|
|
|
a.
Biaya masuk ke Produksi ( Biaya Produksi/production cost ) |
|
|
b. Biaya
Produk Diproduksi ( Harga pokok produksi/cost of goods
manufactured ) |
|
c.
Biaya Produk Terjual ( cost of
goods sold ) |
|
|
d.
Laba Kotor ( gross profit ) |
|
|
|
|
|
|
|
|
Laporan Kos
Produksi |
|
Kos
Masuk Periode : |
|
|
|
Sediaan
Bahan Baku 1 Jan 2013 |
|
68000 |
|
Pembelian
Bahan Baku |
|
200000 |
+ |
Bahan
Baku Tersedia di Produksi |
|
268000 |
|
Sediaan
Bahan Baku 31 Des 2013 |
|
18000 |
- |
Bahan
Baku dalam Produksi |
|
250000 |
|
Tenaga
Kerja Langsung |
|
287000 |
|
Overhead Pabrik |
|
|
159000 |
+ |
Kos
Total Masuk ke Produksi |
|
696000 |
|
Produk
dalam Proses Awal 1 Jan 2013 |
|
105000 |
+ |
Kos
Produksi Selama satu Periode |
|
801000 |
|
Produk
dalam Proses Akhir 31 Des 2013 |
|
65000 |
- |
Kos
Produk di Produksi |
|
736000 |
|
|
|
|
|
|
|
|
|
|
|
Laporan Rugi Laba |
|
Penjualan |
|
|
1000000 |
|
Kos Produk Terjual: |
|
|
|
|
Sediaan
Produk Jadi awal 1 Jan 2013 |
44000 |
|
|
Kos
Produk di Produksi |
736000 |
+ |
|
Produk
Tersedia di Jual |
780000 |
|
|
Produk
Jadi Akhir 31 Des 2013 |
27000 |
|
|
Kos Produk Terjual |
|
|
753000 |
|
Laba Kotor |
|
|
247000 |
|
Biaya Administrasi |
|
|
89000 |
|
laba Bersih |
|
|
158000 |
|
|
|
|
|
|
Maka: |
|
|
|
|
a.
Biaya masuk ke Produksi ( Biaya Produksi/production cost ) |
= |
696000 |
b. Biaya
Produk Diproduksi ( Harga pokok produksi/cost of goods
manufactured ) |
= |
736000 |
c.
Biaya Produk Terjual ( cost of
goods sold ) |
= |
753000 |
d.
Laba Kotor ( gross profit ) |
|
= |
247000 |
|
|
|
|
|
|
|
|
|
|
Soal 3 |
|
|
|
|
|
|
|
|
|
|
Dept. Produksi |
Dept. Pembantu |
Pemotongan |
Perakitan |
Pemeliharaan |
Administrasi |
Biaya
Overhead |
820000 |
608000 |
200000 |
100000 |
Jml
Karyawan |
90 |
210 |
20 |
28 |
Jam
Mesin |
64000 |
16000 |
|
|
JKL |
35000 |
100000 |
|
|
|
|
|
|
|
Biaya
Departemen Pemeliharaan dialokasikan berdasarkan Jumlah karyawan |
|
Biaya
Dept. Administrasi dialokasikan berdasarkan jam mesin (JM). |
|
|
|
|
|
|
|
Penghitungan |
|
|
|
|
|
|
Alokasi
dari departemen pemeliharaan : |
|
|
|
Kos Departemen
Pemeliharaan Total |
= |
200000 |
|
Jumlah Karyawan |
|
20 |
|
|
|
= |
10000 |
Per Pekerja |
Alokasi
ke masing masing Departemen Produksi: |
|
|
Departemen |
Tarif Alokasi |
Jumlah Karyawan |
Alokasi Diterima |
|
Pemotongan |
10000 |
90 |
900000 |
|
Perakitan |
10000 |
210 |
2100000 |
|
Total |
|
300 |
3000000 |
|
|
|
|
|
|
Alokasi
dari departemen Administrasi : |
|
|
|
Overhead departemen
Administrasi |
= |
100000 |
|
Jumlah Mesin Total |
|
80000 |
|
|
|
= |
1.25 |
Per Jumlah Mesin |
|
|
|
|
|
Alokasi
ke masing masing Departemen Produksi: |
|
|
Departemen |
Tarif Alokasi |
Jumlah Mesin |
Alokasi di Terima |
|
Pemotongan |
1.25 |
64000 |
80000 |
|
Perakitan |
1.25 |
16000 |
20000 |
|
Total |
|
80000 |
100000 |
|
|
|
|
|
|
Tarif
Overhead Pabrik di bebankan Departemen Pemotongan: |
|
|
Overhead
Teranggarkan Total Dept. Pemotongan |
= |
1800000 |
Jumlah JKL |
|
35000 |
|
|
|
= |
51.42857143 |
|
|
|
|
|
Tarif
Overhead Pabrik di bebankan Departemen Perakitan: |
|
|
Overhead
Teranggarkan Total Dept. Perakitan |
= |
2728000 |
Jumlah JKL |
|
100000 |
|
|
|
= |
27.28 |
No comments:
Post a Comment